PIPELINE APPROACH & CABLE LAYING
Cable Lay Barge “OES Anaconda” |
Tiger Prawn V – 3m cable burial sled |
|
8 tonne Cable Tensioner |
Mooring Winches |
|
Stern Chute |
Drilling Rig |
|
Cutting the pull head of the Conduit |
Final Reaming Assembly |
|
Drilling Sting down Protective Casing |
HDD/HDPE Insertion |
|
Floating Hose Assembly |
SBM Installation |
|
SBM Installation |
Barge alongside Jetty |
|
HDPE Pipeline Installation |
Shore-Pull Pipe Stringing |
|
Loading Cable into Corral |
Loading Cable into Corral |
|
Loading Cable into Corral |
Cable laying bow chute. |
|
Installing protective sheath over cable prior to laying. |
Cable laying operations on the barge deck. |
|
Cable floatation to enable easy handling for onshore pulling. |
300 Tonne Linear Winch |
|
Coffer Dam |
Cable Tensioner |
|
Post Trenching |
Pipe Pulled from Lay Barge |
|
Limestone Dredged Trench |
Pre-Dregde / Post-Trench |
|
Pipe being pulled Offshore |
Flotation Trench |
|
Loading Cable |
Flexible Pipe Reel |
|
Cutter Suction |
Assembled PLEM awaiting deployment |
|
PLEM frame being lowered into position |
||