PIPELINE APPROACH & CABLE LAYING
![]() Cable Lay Barge “OES Anaconda” |
![]() Tiger Prawn V – 3m cable burial sled |
|
![]() 8 tonne Cable Tensioner |
![]() Mooring Winches |
|
![]() Stern Chute |
![]() Drilling Rig |
|
![]() Cutting the pull head of the Conduit |
![]() Final Reaming Assembly |
|
![]() Drilling Sting down Protective Casing |
![]() HDD/HDPE Insertion |
|
![]() Floating Hose Assembly |
![]() SBM Installation |
|
![]() SBM Installation |
![]() Barge alongside Jetty |
|
![]() HDPE Pipeline Installation |
![]() Shore-Pull Pipe Stringing |
|
![]() Loading Cable into Corral |
![]() Loading Cable into Corral |
|
![]() Loading Cable into Corral |
![]() Cable laying bow chute. |
|
![]() Installing protective sheath over cable prior to laying. |
![]() Cable laying operations on the barge deck. |
|
![]() Cable floatation to enable easy handling for onshore pulling. |
![]() 300 Tonne Linear Winch |
|
![]() Coffer Dam |
![]() Cable Tensioner |
|
![]() Post Trenching |
![]() Pipe Pulled from Lay Barge |
|
![]() Limestone Dredged Trench |
![]() Pre-Dregde / Post-Trench |
|
![]() Pipe being pulled Offshore |
![]() Flotation Trench |
|
![]() Loading Cable |
![]() Flexible Pipe Reel |
|
![]() Cutter Suction |
![]() Assembled PLEM awaiting deployment |
|
![]() PLEM frame being lowered into position |
||